Yong Yuan 1 , Xupeng Yao 2 , Xinhang Xiong 3 * , Chai Rui 4 , Jiao-Long Zhang 5
Correspondence: 2310062@tongji.edu.cn
DOI: https://doi.org/10.55976/cer.2202614681-18
Show More
[1]Pedersen SK, Brøndum S, editors. Fehmarnbelt fixed link: The world’s longest road and rail immersed tunnel. Proceedings of the Institution of Civil Engineers-Civil Engineering; 2018: Thomas Telford Ltd. doi: 10.1680/jcien.17.00037.
[2]Andersen T, Braa J. Reducing the monotonous design in the worlds deepest and longest sub-sea road tunnel Rogfast, Norway. Tunnels and Underground Cities Engineering and Innovation Meet Archaeology, Architecture and Art: CRC Press; 2019. p. 4650–8. doi: 10.1201/9780429424441-493.
[3]van Westendorp P, Louis B, Jackson P. Busan Geoje fixed link. Tunnelling and Underground Space Technology. 2022;122:104279. doi: 10.1016/j.tust.2021.104279.
[4]Lin W, Lin M, Liu X, Yin H, Gao J. Novelties in the islands and tunnel project of the Hong Kong–Zhuhai–Macao Bridge. Tunnelling and Underground Space Technology. 2022;120:104287. doi: 10.1016/j.tust.2021.104287.
[5]Huang W, Zhang J, Chen W, Zhang W. Prefabrication Technology of Steel Shell Concrete Immersed Tube in Shenzhen-Zhongshan Link Construction. Hydraulic and Civil Engineering Technology IX: IOS Press; 2024. p. 1036–47. doi: 10.3233/ATDE241095.
[6]Kitamura A, Takeuchi. Y. Seikan Tunnel. Journal of Construction Engineering and Management. 1983;109(1):25–38. doi: 10.1061/(ASCE)0733-9364(1983)109:1(25).
[7]Matsuo S. An overview of the Seikan tunnel project. Tunnelling and Underground Space Technology. 1986;1(3-4):323–31. doi: 10.1016/0886-7798(86)90015-5.
[8]Kirkland C. The proposed design of the English Channel Tunnel. Tunnelling and Underground Space Technology. 1986;1(3-4):271–82. doi: 10.1016/0886-7798(86)90008-8.
[9]Ge Y, Yuan Y. State-of-the-art technology in the construction of sea-crossing fixed links with a bridge, island, and tunnel combination. Engineering. 2019;5(1):15–21. doi: 10.1016/j.eng.2019.01.003.
[10]Mainwaring G, Olsen TO. Long Undersea Tunnels: Recognizing and overcoming the logistics of operation and construction. Engineering. 2018;4(2):249–53. doi: 10.1016/j.eng.2018.03.004.
[11]Adachi T, Tamura T. Undersea tunnel-effect of drainage and grouting. Elsevier Geo-Engineering Book Series. 3: Elsevier; 2005. p. 327–55. doi: 10.1016/B978-0-08-100191-2.00003-4.
[12]Santos-Reyes J, Beard AN. An analysis of the emergency response system of the 1996 Channel tunnel fire. Tunnelling and Underground Space Technology. 2017;65:121–39. doi: 10.1016/j.tust.2017.02.011.
[13]Shinohara K. Renewal of Train Fire Detection System in Seikan Tunnel. Japanese Railway Engineering. 2022(1 TN.215):62.
[14]Getlinke. Environmental Plan 2025 For sustainable mobility 2024 [cited 2025 May 29]. Available from: https://www.getlinkgroup.com/content/uploads/2021/06/environmental-plan-2025-UK.pdf.
[15]Ikuma M. Maintenance of the undersea section of the Seikan Tunnel. Tunnelling and Underground Space Technology. 2005;20(2):143–9. doi: 10.1016/j.tust.2003.10.001.
[16]Seki Y, Dickson FW, Liou JG, Oki Y, Sakai H, Hirano T. Geochemical prediction of impending catastrophic inflow of seawater during construction of the undersea part of the Seikan Tunnel, Japan. Applied Geochemistry. 1986;1(3):317–33. doi: 10.1016/0883-2927(86)90018-1.
[17]Code for Design of Railway Tunnel. Beijing: China Railway Publishing House; 2016.
[18]Pedersen SK, Brøndum S. Fehmarnbelt fixed link: The world's longest road and rail immersed tunnel. Proceedings of the Institution of Civil Engineers - Civil Engineering. 2018;171(5):17–23. doi: 10.1680/jcien.17.00037
[19]Janssen WPS, Lykke S. The fixed link across the Øresund: tunnel section under the Drogden. Tunnelling and Underground Space Technology. 1997;12(1):5–14. doi: 10.1016/S0886-7798(96)00062-4.
[20]Schwob A, Cagnat E, Chen S, Chan AWY, Ng CCW. Tuen Mun-Chek Lap Kok Link: an outstanding subsea tunnel project in Hong Kong. Proceedings Of The Institution Of Civil Engineers-engineering And Computational. 2020(5):173. doi: 10.1680/jcien.19.00027.
[21]Gatti UC, Migliaccio GC, Laird L. Design management in design-build megaprojects: SR 99 bored tunnel case study. Practice Periodical On Structural Design And Construction. 2014;19(1):148–58. doi: 10.1061/(ASCE)SC.1943-5576.000018.
[22]Code for Design on Rescue Engineering for Disaster Prevention and Evacuation of Railway Tunnel. Beijing: National Railway Administration of the People's Republic of China; 2017.
[23]Code for Design on Operation Ventilation of Railway Tunnel. Chinese industry standard. Beijing: National Railway Administration of the People's Republic of China; 2010.
[24]Technical Code for Waterproofing and Drainage of Railway Tunnel. Beijing: Ministry of Railways of the People's Republic of China; 2000.
[25]Code for Design of Disaster Prevention, Rescue and Evacuation Engineering for Railway Tunnels. Beijing: China Railway Publishing House; 2017.
[26]Keinosuke, Uchida, Yujirou, Wasa, Makoto, Kanai. Design of the shield tunnel for the trans-Tokyo bay highway. Tunnelling and Underground Space Technology. 1992. doi: 10.1016/0886-7798(92)90006-4.
[27]Shioi Y, editor. Trans-Tokyo Bay Highway (Submarine Auto-Route). International Conference on Geotechnics for Sustainable Infrastructure Development; 2023: Springer. doi:10.1007/978-981-99-9722-0_44.
[28]Furumuro K, Kobayashi T, Kanda K. Engineering technologies for steel structures applied to Trans-Tokyo Bay Highway project. Kawasaki Steel Technical Report. 1996(35):p.35–43.
[29]Zhu W, Wang L, Qian Y, Fang Z, Lu K, Wei B, et al. Current status and key challenges of artificial island construction for subaqueous tunnels. Journal of Hohai University(Natural Sciences). 2023;51(3):72–83. doi:10.3876/j.issn.1000-1980.2023.03.010.
[30]Liu C, Li J, Zhang Z, Li P, Yang Y. Model tests on tail-grouting process during URUP shield tunneling in soft soil. Tunnelling and Underground Space Technology. 2020;103:103451. doi: 10.1016/j.tust.2020.103451.
[31]Loy-Benitez J, Song MK, Choi Y-H, Lee J-K, Lee SS. Breaking new ground: Opportunities and challenges in tunnel boring machine operations with integrated management systems and artificial intelligence. Automation in Construction. 2024;158:105199. doi: 10.1016/j.autcon.2023.105199.
[32]Liu G, Tang Y, Zhang H, Li R, Wang H, Liu B, et al. Advances in artificial intelligence and digital twin for tunnel boring machines. Artificial Intelligence Review. 2025;58(9):257. doi: 10.1007/s10462-025-11261-3.
[33]Zhu Y, Zhu Y, Chen EJ, Zhai Y, Min R, Tang B, et al. Synchronous shield tunnelling technology combining advancement and segment fabrication: Principle, verification and application. Underground Space. 2023;13. doi: 10.1016/j.undsp.2023.03.003.
[34]Liu Y, Chen Q, Zhang H, Li Sa, Lin C, Yin L, et al. Open TBM Tunnel Intelligent Construction Technology. Tunnel Construction. 2025;Vol.45(No.4):816–33. doi: 10.3973/j.issn.2096-4498.2025.04.015.
[35]Zhang L, Guo J, Fu X, Tiong RLK, Zhang P. Digital twin enabled real-time advanced control of TBM operation using deep learning methods. Automation in Construction. 2024;158:105240. doi: 10.1016/j.autcon.2023.105240.
[36]Zhang L, Li Z, Lu G, Tan J. Key Construction Technology of Large Cross-section Horseshoe-shaped Shield: a Case Study on Baicheng Tunnel on Menghua Railway. Tunnel Construction. 2020;40:297–306. doi: 10.3973/j.issn.2096-4498.2020.S1.038.
[37]Dang P, Chang L, Tang P, Yu J, Li Z. Intelligent recognition of surrounding rock grades based on TBM tunneling parameters. Frontiers in Earth Science. 2025;13:1692577. doi: 10.3389/feart.2025.1692577.
[38]Yuan Y, Yao X, Zhang J, inventors. Floating-island-type platform for aquatic assembly and launching of tunnel boring machine. China patent CN118148658A. 2024 Jun 7.
[39]Slorach P, Robertson G, Douglas A, Crossland I, Retzler C, Money N, et al., editors. Renewables for Subsea Power–Successful Completion of Transformational Low Carbon Subsea Power Project. Abu Dhabi International Petroleum Exhibition and Conference; 2024: SPE. doi: 10.2118/222012-MS.
[40]Gao H. Research on Technology and Economy of Hydrogen Energy Tram New Standard Engineering Project. Railway Standard Design. 2023;67(11):178–83. doi: 10.13238/j.issn.1004-2954.202301050003.
[41]Tang Y, Zhang Y, Hu M, Miao B, Zhou Y, Li S, et al. Enhanced fatigue properties of pure copper welded joints in submarine cable by double-sided symmetrical oblique laser shock peening. Engineering Fracture Mechanics. 2025;315:110797. doi: 10.1016/j.engfracmech.2024.110797.
[42]da Silva JD, Kubacki M, Hendrix G, Pfeifroth E, Strohmenger T, De Negri V, editors. Design for Reliability: Enabling Enhanced Condition Monitoring in All-Electric Subsea Systems. Offshore Technology Conference; 2025: OTC. doi:10.4043/35774-MS.
[43]Pimentel J, Slater R, Grant A, Vesterkjær R, Normann T, Kothari R, et al., editors. A Road Map for Renewable Energy Integration with Subsea Processing Systems. SPE Offshore Europe Conference and Exhibition; 2021: SPE. doi: 10.2118/205433-MS.
[44]Hu M, Wu B, Zhou W, Wu H, Li G, Lu J, et al. Self-driving shield: Intelligent systems, methodologies, and practice. Automation in Construction. 2022(Jul.):139. doi: 10.1016/j.autcon.2022.104326.
[45]Tan S. Development and application of multi-functional and intelligent tunnel boring machine. Tunnel Construction. 2020;40:1243–50. doi: 10.1016/j.autcon.2022.104326.
[46]Dias R, Dutra A, Spinola A, Carvalho A, editors. Modularization and Standardization of Subsea Components Applied to the Development of New Subsea Injection and Treatment System. Offshore Technology Conference; 2025: OTC. doi: 10.4043/35749-MS.
[47]Grishkov I, Helgen M, Taarneby T, Gardli H, Johansen M, Aas K, editors. Technical Solutions and Innovations in Yggdrasil Project. Offshore Technology Conference; 2025: OTC. doi: 10.4043/35749-MS.
[48]Yuan Y, Yao X, Zhang J, inventors. Construction method for subaqueous tunnels. China patent CN118148647A. 2024 Jun 7.
[49]Falconer S, Krause P, Bäck T, Nordgård-Hansen E, Grasmo G. Condition Classification of Fibre Ropes during Cyclic Bend over Sheave testing Using Machine Learning. International Journal of Prognostics and Health Management. 2022;13(1). doi: 10.36001/ijphm.2022.v13i1.3105.
[50]Burman P, Biswas S, Dhawan M, editors. Module Site Installation and Anchorage—Case Study. Lecture Notes in Civil Engineering; 2023. doi: 10.1007/978-981-19-9394-7_26.
Copyright © 2026 Yong Yuan, Xupeng Yao, Xinhang Xiong, Chai Rui, Jiao-Long Zhang

This work is licensed under a Creative Commons Attribution 4.0 International License.
Copyright licenses detail the rights for publication, distribution, and use of research. Open Access articles published by Luminescience do not require transfer of copyright, as the copyright remains with the author. In opting for open access, the author(s) should agree to publish the article under the CC BY license (Creative Commons Attribution 4.0 International License). The CC BY license allows for maximum dissemination and re-use of open access materials and is preferred by many research funding bodies. Under this license, users are free to share (copy, distribute and transmit) and remix (adapt) the contribution, including for commercial purposes, providing they attribute the contribution in the manner specified by the author or licensor.

Luminescience press is based in Hong Kong with offices in Wuhan, China.
E-mail: publisher@luminescience.cn